Due to the multiple objectives of steel plate distribution from suppliers with uncertainty to computer numerical control cutters,the supplydistribution system was modeled by dependentchance goal programming (DCGP).This model revised the disposal process of goals in the same priority and minimized the deviation from the target with certain preemptive priorities.It was solved by a hybrid intelligent algorithm which integrated stochastic simulation,neural network and genetic algorithm(GA).The calculating result shows that the chance of crucial cutters to achieve the supreme cutting lengths is maximized.The drawnout amount of steel plates increases while the sequence of the distribution retains.The multiple objectives of the production can be satisfied.It proves that DCGP can eliminate and control the effect on the production because of suppliers’ uncertainty in distribution system with multisuppliers.