Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University, Shanghai 200092, China; Department of Geotechnical Engineering,Tongji University, Shanghai 200092, China 在期刊界中查找 在百度中查找 在本站中查找
Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University, Shanghai 200092, China; Department of Geotechnical Engineering,Tongji University, Shanghai 200092, China 在期刊界中查找 在百度中查找 在本站中查找
Based on the bid-section of Binhai mass transit from Tianjin Station to Qijing Road Station,3D-FEM is put forward to simulate shield tunneling long distance under multi-tracks of railway.According to the simulation results,settlement of ground surface along and perpendicular to the shield tunnel are analyzed in detail,the discipline of ground surface settlement in different driving stages is uncovered; the disturbance area of ground and the settlement ratio dedicated by first tunnel and second tunnel are studied,the function of railway load in causing ground displacement is also discussed.The results fit well with monitoring data and can be used as a reference for similar projects.