Improved Method of Step by Step Modelling and Its Application in Construction Simulation
Author:
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献 [13]
  • |
  • 相似文献 [20]
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    针对当前分步建模法存在的刚度矩阵修正和新增结构定位等问题,提出了将每个施工阶段分为初始时刻和结束时刻进行分析的方法.在此基础上,提出了钢结构施工过程分析中结构刚度矩阵修正的新方法.同时,针对新增构件定位及结构位形定位问题,提出了修正设计位形定位法.最后,对现有分步建模法的实现方法进行了改进.基于Matlab软件平台,编制了改进分步建模法的计算模块,模拟分析2层刚架结构的施工过程,并与状态变量叠加法、生死单元法、一步成型法进行对比.结果表明,本文的刚度矩阵修正方法及修正设计位形方法正确、有效、计算精度高.

    Abstract:

    Based on the problems of the modification of stiffness matrix and the positioning of added structures in the step by step modelling method, a method which divides each construction stage into beginning phase and end phase and analyzes different phases respectively was proposed. Subsequently, a new method for modifying the stiffness matrix of structures was developed in construction process analysis of steel structures. Meanwhile, to determine the position of the added structures, a correction positioning method of design configuration was advised herein. Consequently, the existing step by step modelling method was improved. Furthermore, to simulate the construction process of a twostory frame, the improved step by step modelling method was programmed in Matlab software. The numerical results of the improved step by step modelling method were compared with those of state variable superposition method, birthdeath element method and one step forming method. It is shown that the modification methods of stiffness matrix and the positioning of design configuration are reasonable, effective and accurate.

    参考文献
    [1] 罗永峰,王春江,陈晓明. 建筑钢结构施工力学原理[M]. 北京:中国建筑工业出版社, 2009:40-45.LUO Yongfeng, WANG Chunjiang, CHEN Xiaoming. Construction mechanism of steel structures in building engineering [M]. Beijing: China Architecture Building Press, 2009: 40-45.
    [2] P. J. S. Cruz, A. R. Mari and P. Roca. Nonlinear Time-Dependent Analysis of Segmentally Constructed Structures [J]. Journal of Structural Engineering. 1998, 124: 278-287.
    [3] 罗永峰,叶智武,陈晓明,等. 空间钢结构施工过程监测关键参数及测点布置研究[J]. 建筑结构学报. 2014, 35(11): 108-115.LUO Yongfeng, YE Zhiwu, CHEN Xiaoming, et al. Research on key parameter selection and monitoring point arrangement in construction monitoring of spatial steel structures [J]. Journal of Building Structures. 2014, 35(11): 108-115.
    [4] 罗永峰,叶智武,郭小农. 钢结构施工过程监测数据缺失机理与处理方法[J]. 同济大学学报(自然科学版). 2014, 42(06): 823-829.LUO Yongfeng, YE Zhiwu, GUO Xiaonong. Data Missing Mechanism in Construction Monitoring and Its Treatment [J]. Journal of Tongji University (Natural Science). 2014, 42(06): 823-829.
    [5] 刘学武,郭彦林. 考虑几何非线性钢结构施工力学分析方法[J]. 西安建筑科技大学学报(自然科学版). 2008, 40(2): 161-169.LIU Xuewu, GUO Yanlin. Construction mechanics analytical procedures for steel structures in view of the geometric nonlinearity [J]. J. Xi'an Univ. of Arch. Tech. (Natural Science Edition). 2008, 40(2): 161-169.
    [6] Chang-Koon Choi, M. ASCE and E-Doo Kim. Multistory Frames under Sequential Gravity Loads [J]. Journal of Structural Engineering. 1985, 111: 2373-2384.
    [7] 曹志远. 土木工程分析的施工力学与时变力学基础[J]. 土木工程学报. 2001, 34(3): 41-46.CAO Zhiyuan. Construction mechanics and time-varying mechanics in civil engineering [J]. China Civil Engineering Journal. 2001, 34(3): 41-46.
    [8] 王光远. 论时变结构力学[J]. 土木工程学报. 2000, 33(6): 105-108.WANG Guangyuan. On mechanics of time-varying structures [J]. China Civil Engineering Journal. 2000, 33(6): 105-108.
    [9] Cao Zhiyuan, Liang Gang and Tang Shougao. Topological FEM method for the analysis of time- varying structures [J]. Communications in Numerical Methods in Engineering. 2004, 20: 807-817.
    [10] 卓新. 空间结构施工方法研究与施工全过程力学分析[D]. 杭州:浙江大学, 2001:56-58.ZHUO Xin. Research on Construction Methods and Mechanics Analysis on Whole Erection Process for Space Structures [D]. Hangzhou: Zhejiang University, 2001:56-58.
    [11] 郑江,葛鸿鹏,王先铁,等. 局部位形约束生死单元法及其在施工力学分析中的应用[J]. 建筑结构学报. 2012, 33(8): 101-108.ZHENG Jiang, GE Hongpeng, WANG Xiantie, et al. A method of element birth and death of local configuration constraint and its application in construction mechanics [J]. Journal of Building Structures. 2012, 33(8): 101-108.
    [12] 张其林,罗晓群,高振锋,等. 大跨钢结构施工过程的数值跟踪和图形模拟[J]. 同济大学学报(自然科学版). 2004, 32(10): 1295-1299.ZHANG Qilin, LUO Xiaoqun, GAO Zhenfeng, et al. Numerical Tracing and Graphic Simulation for Construction Processes of Large Span Pre-tensioned Steel Structures [J]. Journal of Tongji University (Natural Science). 2004, 32(10): 1295-1299.
    [13] 崔晓强,郭彦林,叶可明. 大跨度钢结构施工过程的结构分析方法研究[J]. 工程力学. 2006, 23(5): 83-88.CUI Xiaoqiang, GUO Yanlin, YE Keming. Research on the construction mechanic method of long-span steel structures [J]. Engineering Mechanics. 2006, 23(5): 83-88.
    引证文献
引用本文

叶智武,罗永峰,陈晓明,贾宝荣.施工模拟中分步建模法的改进实现方法及应用[J].同济大学学报(自然科学版),2016,44(1):0073~0080

复制
分享
文章指标
  • 点击次数:1966
  • 下载次数: 992
  • HTML阅读次数: 38
  • 引用次数: 0
历史
  • 收稿日期:2014-12-22
  • 最后修改日期:2015-11-30
  • 录用日期:2015-09-14
  • 在线发布日期: 2016-01-26
文章二维码