Abstract:A critical chain project management bias network model (CCPMBN) based on work breakdown structure (WBS) and Bayesian Network was established, which took full consideration into the temporal relations and resource constraints. The corresponding resources were proposed and the deadline of the construction was determined by Monte Carlo Model. The result shows that, with the method, the critical factors influencing the deadline can be well recognized. The proposed model provides an important reference for realizing of the construction schedule.