多失效模式混联生产线生产率估算
CSTR:
作者:
作者单位:

同济大学 机械与能源工程学院,同济大学 机械与能源工程学院,同济大学 机械与能源工程学院,同济大学 机械与能源工程学院

中图分类号:

TH186

基金项目:

上海市科委基础研究重点项目(12JC1408700);国家高档数控机床与基础制造装备科技重大专项(2011ZX04015-022)


Production Rate Estimation of Seriesparallel Production Line with Multiple Failure Modes
Author:
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献 [20]
  • |
  • 相似文献 [20]
  • | | |
  • 文章评论
    摘要:

    针对存在多失效模式的混联生产线生产率估算问题,综合考虑机器的时间相关失效(TDF)和操作相关失效(ODF),分析了机器正常加工、TDF、ODF和TDF&ODF四种状态,建立了各状态间转移关系.基于连续时间马尔可夫链模型,以两工作站单缓冲区生产单元为基础,结合生产线近似分解法及并行机器等效法,提出了一种多失效模式下混联生产线生产率估算方法.最后,通过多个算例的仿真对比及某生产线实例,验证了本文方法的准确性与高效性.

    Abstract:

    An analytical model was proposed to estimate the production rate of seriesparallel production line. Each machine has both operation dependent failure (ODF) and time dependent failure (TDF). Machine states include operation, ODF, TDF and ODF&TDF. First, the machine states space and transition relations were defined. The twoworkstation line performance evaluation method was established based on discrete state Markov chain, and this method was used as a building block of the decomposition method. The whole line production rate was estimated through iterative calculation of the decomposition method. In order to improve the efficiency, a set of parallel machines were replaced with an equivalent machine. Several numerical examples and an actual production line case were carried out to demonstrate the accuracy and efficiency of the proposed method.

    参考文献
    [1] Buzacott J A. Prediction of the efficiency of production systems without internal storage[J]. International Journal of Production Research, 1968, 6(3):173-188.
    [2] Jingshan L, Dennis E B, Ningjian H, et al. Throughput analysis of production systems: recent advances and future topics[J]. International Journal of Production Research, 2009, 47(14):3823-3851.
    [3] Dang Q, Pham K. Design of a Footwear Assembly Line Using Simulation-based ALNS[J]. Procedia CIRP, 2016, 40:597-602.
    [4] Tiacci L. Event and object oriented simulation to fast evaluate operational objectives of mixed model assembly lines problems[J]. Simulation Modelling Practice and Theory, 2012, 24:35-48.
    [5] 张新艳, 周健, 韦亮. MOHHA求解不可靠生产线多目标缓冲区分配问题[J]. 计算机工程与应用, 2014, (4):240-244,261.
    ZHANG Xinyan, ZHOU Jian, WEI Liang. Multi-objective hybrid heuristic algorithm to buffer allocation in unreliable production line[J]. Computer Engineering and Applications, 2014, (4):240-244,261.
    [6] Zhou B, Xia B, Xi L. An improved decomposition method for evaluating the performance of transfer lines with unreliable machines and finite buffers[J]. International Journal of Production Research, 2012, 50(15):4009-4024.
    [7] Ouazene Y, Yalaoui A, Chehade H. Analysis of a Buffered Two-Machine Production Line with Unreliable Machines[J]. Journal of multiple-valued logic and soft computing, 2014, 22(4-6):423-441.
    [8] 刘佳璐. 串并联生产系统的模型研究[D]. 天津: 天津大学电气与自动化工程学院, 2011.
    LIU Jialu. Analytical Modeling of Series-parallel Production Lines[D]. Tianjin: School of Electrical Engineering and Automation, Tianjin University, 2011
    [9] Tan B, Gershwin S B. Modelling and analysis of Markovian continuous flow systems with a finite buffer[J]. Annals of Operations Research, 2011, 182(1):5-30.
    [10] Colledani M, Gershwin S B. A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines[J]. Annals of Operations Research, 2013, 209(1):5-40.
    [11] Aziz A, Jarrahi F, Abdul-Kader W. Modeling and Performance Evaluation of a Series-parallel Flow Line System with Finite Buffers[J]. Info Information Systems & Operational Research, 2010, 48(2):103-120.
    [12] 穆华灵, 汪峥. 含有并行机器组的串行短生产线的性能分析[J]. 计算机技术与发展, 2012(10):194-197.
    MU Hualing, WANG Zheng. Analysis of Short-serial Production Line with Multiple Parallel-machine Workstations [J]. Computer Technology and Development, 2012(10):194-197.
    [13] 张英芝, 牛序磊, 申桂香, 等. 基于竞争失效模式的数控机床可靠性建模[J]. 系统工程理论与实践, 2014(08):2144-2148.
    ZHANG Yingzhi, NIU Xulei, SHEN Guixiang, et al. Numerically-controlled machine reliability modeling based on competing failure mode[J]. Systems Engineering - Theory & Practice, 2014(08):2144-2148.
    [14] Gershwin S B. Manufacturing systems engineering[M]. Prentice Hall, 1994.
    [15] Mourani I, Hennequin S, Xie X. Failure models and throughput rate of transfer lines[J]. International Journal of Production Research, 2007, 45(8):1835-1859.
    [16] Matta A, Simone F. Analysis of two-machine lines with finite buffer, operation-dependent and time-dependent failure modes[J]. International Journal of Production Research, 2016, 54(6):1850-1862.
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

刘雪梅,贾勇琪,祁国栋,邵焕.多失效模式混联生产线生产率估算[J].同济大学学报(自然科学版),2017,45(02):0281~0288

复制
分享
文章指标
  • 点击次数:1853
  • 下载次数: 917
  • HTML阅读次数: 49
  • 引用次数: 0
历史
  • 收稿日期:2016-05-19
  • 最后修改日期:2016-11-20
  • 录用日期:2016-08-29
  • 在线发布日期: 2017-03-07
文章二维码