Turnback capacity have become a major concern for the line capacity of rail transit. Take a rail transit stub-end terminal with four-tail tracks as background, based on N-track integrated model, a mixed integer programming optimization model is formed to estimate the turnback capacity and the track occupation strategies with the objective of minimizing occupation times of trains. Operations and design parameters such as tail track allocation strategies, train layover time, homogeneity of trains are also considered in this model. We illustrated our model using computational experiments drawn from the real rail transit line 16 in Shanghai and reached results which show that how the track occupation strategy, maximum layover time, homogeneity impact on turnback capacity.
[1] 刘循. 城市轨道交通折返能力的匹配性设计研究[J]. 现代城市轨道交通, 2012(05):64-68, 71.LIU Xun. Study on Design of Matching Turn-Back Ability in Urban Rail Transit[J]. Modern Urban Transit, 2012(05):64-68, 71.
[2] Jiang Z, Tan Y, Wang F, et al. Turnback Capacity Assessment and Delay Management at a Rail Transit Terminal with Two-Tail Tracks[J]. Mathematical Problems in Engineering, 2015(1930):1-12.
[3] Kittelson Assoc I, Parsons Brinckerhoff I, KFH Group I, et al. Transit Capacity and Quality of Service Manual, Third Edition,TCRP Report 165[R]. Washington, DC: Transportation Research Board, 2013.
[4] 王志海. 轨道交通终点站折返能力分析及改进研究[J]. 城市轨道交通研究, 2012(04):86-89.WANG Zhihai. Analysis and Improvement of the Turn-back Capacity at Rail Transit Terminal[J]. Urban Mass Transit, 2012(04):86-89.
[5] 徐瑞华, 石俊刚. 基于元胞自动机的列车站前折返仿真模型[J]. 系统仿真技术, 2011(04).XU Ruihua, SHI jungang. Cellular Automaton Model for Simulating Station-front Turning-back[J]. System Simulation Technology, 2011(04).
[6] Gill D C. Assessment of mass transit turn-back capacity using dynamic simulation models: International conference on computers in railways, 2000[C].
[7] 张增勇, 毛保华, 蒋玉琨等. 基于牵引计算的城市轨道交通站后折返站能力计算方法[J]. 系统工程理论与实践, 2013(02):450-455.ZHANG Zengyong, MAO Baohua, JIANG Yukun, et al. Calculation method for station-end turn-back capacity of urban rail transit based on train traction[J]. Systems Engineering-Theory Practice, 2013(02):450-455.
[8] 马琳, 陈德旺, 基于单车仿真和作图解析的城轨折返能力分析方法[J]. 系统仿真技术, 2011.MA Lin, CHENG Dewang. A Method on Turn - back Capability Analysis of Urban Rail Transit Using Computer Simulation and Mapping Analysis[J]. System Simulation Technology, 2011.
[9] T?rnquist J, Persson J A. N-tracked railway traffic re-scheduling during disturbances[J]. Transportation Research Part B-Methodological, 2007,41(3):342-362.
[10] 王俊锋, 孙旺, 郜洪民. 城市轨道交通车站站前折返间隔分析[J]. 城市轨道交通研究, 2013(04):69-73.WANG Junfeng, SUN Wang, GAO Hongmin. Analysis of Pre-station Turn-back Headway in Urban Rail Transit[J]. Urban Mass Transit, 2013(04):69-73.
[11] 马能艺. 一种常用折返站型的折返能力改进方案[J]. 城市轨道交通研究, 2013(02):99-101.MA Nengyi. Improvement Scheme of the Turn-back Capacity at Conventional Turn-back Station[J]. Urban Mass Transit, 2013(02):99-101.
[12] 苗沁, 周天星. 城市轨道交通折返站折返能力分析[J]. 城市轨道交通研究, 2010(11):57-61, 64.MIAO Qin, ZHOU Tianxing. Analysis of Turning-back Capacity at Urban Rail Transit Station[J]. Urban Mass Transit, 2010(11):57-61, 64.
[13] 徐小亮, 柴慧君, 薛强. 地铁列车站前折返效率影响因素分析[J]. 城市轨道交通研究, 2014,17(10):119-121.XU Xiaoliang, CHAI Huijun, XUE Qiang. Analysis of Factors Influencing the Front Turnback Efficiency of Metro Train[J]. Urban Mass Transit, 2014,17(10):119-121.