Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University , Shanghai 201804, China; Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Shanghai 201804, China 在期刊界中查找 在百度中查找 在本站中查找
Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University , Shanghai 201804, China; Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Shanghai 201804, China 在期刊界中查找 在百度中查找 在本站中查找
Based on the displacement correcting method, the China railway track system(CRTS)Ⅱslab track was modelled in a finite element software. The damage propagation laws of wide and narrow joint separation, mortar-layer separation and supporting-layer cracks during the correction process are studied. The results show that the wide and narrow joint separation would decrease the ability to resist damage of the bonding interface; the mortar-layer separation made little influence on bonding interface; the supporting-layer cracks would grow deeper into the inside of the supporting-layer during the correction process.
[2]徐伟昌, 许玉德, 谭社会,等. 高速铁路无砟轨道线路质量等级管理[M]. 北京: 中国铁道出版社, 2016.XU Weichang, XU Yude, TAN Shehu, et al. Track quailty grade management of high-speed railway ballastless track[M]. Beijing: China Railway Press, 2016.
[3]肖军华, 王炳龙, 王长丹,等. 高速铁路路基不均匀沉降及其控制[M]. 上海: 同济大学出版社, 2015.XIAO Junhua, WANG Binglong, WANG changdan, et al. Uneven settlement of high-speed railway subgrade and its control[M]. Shanghai: Tongji University Press, 2015.
[4]徐伟昌, 李振廷, 王永华,等. WJ-7型大调量扣件地段轨道动力响应测试及分析[J]. 铁道标准设计, 2014(10):26-29.XU Weichang, LI Zhenting, WANG Yonghua, et al. Test and analysis of track dynamic response on the sections with WJ-7 fastenings of large adjustment[J]. Railway Standard Design, 2014(10):26-29.
[5]谭社会. 高速铁路无砟轨道线形纠偏技术进展研究[J]. 铁道科学与工程学报, 2018(2) :310-318.TAN Shehui. State of lifting and inclination correction technique of high-speed railway ballastless track[J]. Journal of Railway Science and Engineering, 2018(2):310-318.
[6]邢小墨. 高速铁路无砟轨道抬升纠偏新技术研究[J]. 铁道建筑技术, 2016(4):107-109.XING Xiaomo. New Technology for Lifting and Inclination Correction of the High-speed Railway Ballastless Track[J]. Railway Construction Technology, 2016(4):107-109.
[7]温希华. 高速铁路CRTSⅡ型板式无砟轨道纠偏技术研究[J]. 铁道勘察, 2017, 43(1):6-9.WEN Xihua. Research on the Deviation Rectification Technology for High-Speed Railway of CRTSⅡ slab ballastless track[J]. Railway Investigation and Surveying, 2017, 43(1):6-9.
[8]刘学毅, 苏成光, 刘丹,等. 轨道板与砂浆粘结试验及内聚力模型参数研究[J]. 铁道工程学报, 2017, 34(3):22-28.LIU Xueyi, Su Chenguang, LIU Dan, et al. Research on the Bond Properties between Slab and CA Mortar and the Parameters Study of Cohesive Mode[J]. Journal of Railway Engineering Society, 2017, 34(3):22-28.
[9]Zhang Z, Paulino G H. Cohesive zone modeling of dynamic failure in homogeneous and functionally graded materials. International Journal of Plasticity, 2005, 21(6): 1195 -1254.
[10]Hu N, Zemba Y, Okabe T, et al. A new cohesive model for simulating delamination propagation in composite laminates under transverse loads. Mechanics of Materials, 2008, 40(11): 920 - 935.
[11]董佳佳. CRTSⅡ型板式轨道宽窄接缝温度荷载下受力及损伤行为研究[D]. 成都: 西南交通大学, 2017.DONG Jiajia. Research on damage mechanism of wide and narrow joints in CRTSⅡ slab track structure under temperature load[D]. Chengdu: Southwest Jiaotong University, 2017.
[12]刘钰, 赵国堂. CRTSⅡ型板式无砟轨道结构层间早期离缝研究[J]. 中国铁道科学, 2013, 34(4):1-7.LIU Yu, ZHAO Guotang. Analysis of Early Gap between Layers of CRTSⅡ Slab Ballastless Track Structure[J]. China Railway Science, 2013, 34(4):1-7.
[13]朱胜阳, 蔡成标. 温度和列车动荷载作用下双块式无砟轨道道床板损伤特性研究[J]. 中国铁道科学, 2012, 33(1):6-12.ZHU Shengyang, CAI Chengbiao. Research on the Damage Characteristics of Double-Block Ballastless rack Bed Slab under Temperature and Vehicle Dynamic Loads[J]. China Railway Science, 2012, 33(1):6-12.