后结合预应力组合梁桥的抗裂性能试验
作者:
作者单位:

1.同济大学 土木工程学院,上海 200092;2.上海高性能组合结构桥梁工程技术研究中心,上海 200092

作者简介:

陈德宝(1996—),男,博士生,主要研究方向为钢桥与组合结构桥梁。E-mail: tjchendebao@outlook.com

通讯作者:

苏庆田(1974—),男,教授,博士生导师,工学博士,主要研究方向为钢桥与组合结构桥梁。 E-mail: sqt@tongji.edu.cn

中图分类号:

U443.35

基金项目:

浙江省交通运输厅科技项目(2020031);江西省重大研发专项(20165ABC2800)


Experiment on Crack Resistance Performance of Post-Connected Prestressed Composite Girder Bridge
Author:
Affiliation:

1.College of Civil Engineering, Tongji University, Shanghai 200092, China;2.Shanghai Engineering Research Center of High Performance Composite Bridges, Shanghai 200092, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为研究后结合预应力组合梁桥的预压应力分布和负弯矩区抗裂性能,设计2根连续组合试验梁,其中一根为负弯矩区设计成全预应力混凝土板的后结合组合梁,另一根为无预应力的普通组合梁。测试了试验梁在张拉预应力筋和静力加载过程的受力性能,得到负弯矩区截面的应力状态和裂缝分布。试验表明:因钢梁和混凝土板不连接,预压应力由混凝土板承担且混凝土截面的预压应力沿着横向的分布不均匀。后结合预应力组合梁的初始开裂荷载和群钉孔外的开裂荷载分别是普通组合梁的3.1和5.0倍。后结合预应力组合梁抑制裂缝沿着横向贯穿混凝土板,提高了负弯矩区的抗裂性能。混凝土平均裂缝间距约等于横向钢筋间距。后结合预应力组合梁在开裂后的受力状态与普通组合梁类似。

    Abstract:

    In order to study the pre-compression stress distribution and the crack resistance performance of the negative moment region of the post-connected prestressed composite girder bridge, two continuous composite test girders were designed. One was a post-connected composite girder whose concrete slab in the negative region was designed as a fully prestressed concrete slab, and the other was a normal composite girder without prestress. The mechanical behavior of the girders in the process of tensioning prestressed tendons and static loading were tested, and the stress state and crack distribution of the sections in the negative moment region were obtained. The test shows that the pre-compression stress is borne by the concrete slab because the steel girder and the concrete slab are not connected. The pre-compression stress of the concrete section is unevenly distributed along the transverse direction. The initial cracking load of the post-connected prestressed composite girder and the cracking load outside the group stud hole are 3.1 times and 5.0 times that of the normal composite girder, respectively. The post-connected prestressed composite girder suppresses cracks that penetrate the concrete slab along the transverse direction and improves the crack resistance performance in the negative moment region. The average crack spacing of concrete is approximately equal to the spacing of transverse rebars. The stress state of the post-connected prestressed composite girder after cracking is similar to that of the normal composite girder.

    参考文献
    相似文献
    引证文献
引用本文

陈德宝,曾明根,苏庆田.后结合预应力组合梁桥的抗裂性能试验[J].同济大学学报(自然科学版),2023,51(2):213~221

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-09-26
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-03-03
  • 出版日期:
文章二维码