Performance Analysis and Prediction of Beach Nourishment Project in Zhongzhi 6th and 9th Bathing Places in Beidaihe
CSTR:
Author:
Affiliation:

Clc Number:

TV 148+.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to meet the using demand of Zhongzhi 6th and 9th bathing places in 2008’s summer, a project of beach nourishment with submerged breakwater is carried out by Qinhuangdao Mineral Resource and Hydrogeological Brigade, Hebei Geological Prospecting Bureau. In this paper the beach nourishment project is modeled using GENESIS model, and a result which fits well with the measured shoreline is gotten. With the same model and parameters, long-term performance of the project is simulated, and the result shows that without follow-up nourishment and project, the bathing places can keep suitable for bathing in only 2 to 3 years. So it is proposed to nourish the beaches in time to keep the beach’s use in recent years and carry out the beach nourishment project of west beach as soon as possible.

    Reference
    Related
    Cited by
Get Citation

Kuang Cuiping, PAN Yi, ZHANG Yu, Liu Shuguang, YANG Yanxiong, ZHANG Jiabo. Performance Analysis and Prediction of Beach Nourishment Project in Zhongzhi 6th and 9th Bathing Places in Beidaihe[J].同济大学学报(自然科学版),2010,38(4):509~514

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 26,2009
  • Revised:January 24,2010
  • Adopted:October 19,2009
  • Online: April 28,2010
  • Published:
Article QR Code