Ground movements caused by the tunnel construction in soft ground endanger the safety of the existing building.Double control criterion was proposed for shield tunnel undercrossing by taking the existing deformation of building into consideration.For Shanghai Metro Line 11 undercrossed the Chongsi Building,Xuhui Middle School,the deformation of Chongsi Building was detected and analyzed,and the status of the building was assessed.The double control criterion for shield tunnel undercrossing Chongsilou Building was established based on a consideration of the building existing deformation.A management over the section undercrossing the Chongsi Building proves the feasibility of the deformation control criterion.
Reference
Related
Cited by
Get Citation
GE Shiping, XIE Dongwu, DING Wenqi, YANG Hongjie. Undercrossing Disturbance Control Criterion for Shield Tunnel With Consideration of Building Existing Deformation[J].同济大学学报(自然科学版),2011,39(11):1616~1621