Influence of Project Delivery System and Payment Method on Project Cost Performance
CSTR:
Author:
Affiliation:

Clc Number:

TU 723

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on three indicators of rework cost,change cost and cost growth,data from 181 projects were analyzed through T test and analysis of variance.The results show that considering project delivery method,DB method has a significantly lower cost growth in comparison to DBB method,with a lower rework cost and change cost also,though not significant.In respect of Payment method,cost growth is the lowest in lump sum contract through negotiation with a mean value of -1.97%,and the highest in unit price contract with a mean value of 10.70%.Taking these two aspects into consideration together,projects with DB method and lump sum contract through negotiation have the lowest cost growth,accompanied with the highest change cost,which should draw project participants’ attention.

    Reference
    Related
    Cited by
Get Citation

CHEN Yongqiang, JIAO Junshuang. Influence of Project Delivery System and Payment Method on Project Cost Performance[J].同济大学学报(自然科学版),2011,39(9):1407~1412

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 20,2010
  • Revised:August 05,2011
  • Adopted:March 17,2011
  • Online: October 10,2011
  • Published:
Article QR Code