Relationship Among Shanghai World Expo Project Complexity,Time Limit and Human Cost
CSTR:
Author:
Affiliation:

Clc Number:

TD721+.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Shanghai Expo AB area construction project was taken as an example to discuss the relationship of project complexity and time limit for it, and human cost under the four scenarios of parallel, sub contract, organization structure and members optimization by means of the simulation software ProjectSim. It is concluded that in some cases there are no conflicts between the project complexity, time limit and its human cost, and that all of them can be optimized simultaneously through increasing relevant personnel on key positions, which is totally different from the traditional view that time limit is often in conflict with human cost.

    Reference
    Related
    Cited by
Get Citation

HE Qinghua, LUO Lan, LI Yongkui, LU Yunbo. Relationship Among Shanghai World Expo Project Complexity, Time Limit and Human Cost[J].同济大学学报(自然科学版),2012,40(11):1742~1746

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 27,2011
  • Revised:September 24,2012
  • Adopted:April 16,2012
  • Online: November 27,2012
  • Published:
Article QR Code