Comparison of Project Production efficiency between DBB and DB delivery system on Production Frontier
CSTR:
Author:
Affiliation:

Clc Number:

F223

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Project Delivery System (PDS) is one of the crucial success factors for construction project. From the perspective of Project Production efficiency, this paper constructed a project production efficiency index system and built the corresponding project production frontier of PDSs for comparing Design-Bid-Build(DBB) and Design-Build(DB) delivery system by applying Production Frontier and Data Envelopment Analysis method. Basing on the comparison of DBB and DB’s efficiency, this paper draw a conclusion that DBB delivery method has advantage in duration, while DB has advantage in cost. On such results, the inner mechanism was further explored, thus to provide a scientific decision- making support for owner’s PDS selection practice.

    Reference
    Related
    Cited by
Get Citation

Chen Yongqiang, Zhang Wen. Comparison of Project Production efficiency between DBB and DB delivery system on Production Frontier[J].同济大学学报(自然科学版),2013,41(2):309~

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 11,2011
  • Revised:October 25,2012
  • Adopted:August 12,2012
  • Online: July 08,2013
  • Published:
Article QR Code