Dynamic evolution analysis on Frozen Wall Temperature of Cross Passage in Shanghai Yangtze River Tunnel
CSTR:
Author:
Affiliation:

Clc Number:

X705

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The dynamic evolution process of frozen wall temperature in Tunnel Construction of Shanghai Yangtze is studied by finite element method. Considering the effect of heat radiation of tunnel lining and refrigerate battery, a three- dimensional solid element modal is built to simulate the construction process, in which latent heat of phase change is indicated by way of Enthalpy application. The law of frozen wall development, frozen wall closure, average temperature and effective thickness is summarized in this paper. Research demonstrates that the process of froze wall forming is successive and has some rules to follow. The time of frozen wall closure, average temperature and thickness agrees well with the on-site test data, which validates the numerical results. The result is of value to similar projects.

    Reference
    Related
    Cited by
Get Citation

LIPan, XIE Xiongyao. Dynamic evolution analysis on Frozen Wall Temperature of Cross Passage in Shanghai Yangtze River Tunnel[J].同济大学学报(自然科学版),2013,41(4):515~521

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 06,2011
  • Revised:January 10,2013
  • Adopted:November 26,2012
  • Online: July 08,2013
  • Published:
Article QR Code