Risk Analysis of Shield Construction by Polymorphic Bayesian Networks Model
CSTR:
Author:
Affiliation:

Clc Number:

TU473

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Subway tunnel is characteristic of large-scale investment, many risk factors, large social impact, etc., which determines the need of risk management during the construction. As the fuzziness of risk, it is difficult to use an accurate probability or a probability interval to describe risks. So this paper suggests that shield excavation risks be analyzed by multiple probability intervals. Based on the five probability intervals which divide risk probabilities into five ranks in the subway and underground engineering, risk factor questionnaire has been designed, and the probability distributions of probability ranks about shield construction risk factors could be figured out through expert survey method. According to the questionnaire, Bayesian Networks is applied to establish a multi-state system to analyze the probability distributions. The multi-state system is used in the risk assessment of a subway tunnel, the probability rank of the project is figured out and at the corresponding probability rank,such risk factors as poor seal in the portals, axis deviation which causes segment failure and the damage, destruction of sealing material are considered as the key control objects.

    Reference
    Related
    Cited by
Get Citation

Wang hongwei, Zhou jian, Wu shaohai. Risk Analysis of Shield Construction by Polymorphic Bayesian Networks Model[J].同济大学学报(自然科学版),2013,41(2):186~190

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 04,2012
  • Revised:November 16,2012
  • Adopted:July 13,2012
  • Online: July 08,2013
  • Published:
Article QR Code