System Reliability Assessment Method for Temporary Structure in Bridge Construction Stage
CSTR:
Author:
Affiliation:

Tongji university,Tongji university,Tongji university

Clc Number:

U447

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Condition assessment method for temporary structure is established based on system reliability analysis method. Failure models of temporary structures are established by the combined method with finite element analysis and series parallel model. Values of resistances, loads, and human errors of temporary structure in construction stage are discussed, and reasonable reliability models are proposed. Effects of wind loads and human errors on the temporary structure are considered, and component level and system level reliability assessment are analyzed respectively. Finally, performance of a triangle traveler is analyzed with the system reliability method. Results show that, using system reliability analysis method for temporary assessment can not only solve the uncertainties of resistance and load well, but also ensure the whole structure to have the same reliability.

    Reference
    Related
    Cited by
Get Citation

NIE Ruifeng, SHI Xuefei, RUAN Xin. System Reliability Assessment Method for Temporary Structure in Bridge Construction Stage[J].同济大学学报(自然科学版),2014,42(10):1493~1498

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 13,2013
  • Revised:July 18,2014
  • Adopted:May 13,2014
  • Online: October 14,2014
  • Published:
Article QR Code