Novel Method for Schedule Risks Assessment in Construction Projects from Perspective of Risk Chain
CSTR:
Author:
Clc Number:

F294; C934

  • Article
  • | |
  • Metrics
  • |
  • Reference [31]
  • |
  • Related [20]
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    The concept of risk chain is put forward, and a novel approach was proposed for assessing schedule risks. First, in order to find out the interrelationships among risks, the evaluation information provided by a panel of experts was analyzed by an objectifying process; secondly, a risk interaction network was established based on the identified interrelationships, and the method to divide a risk interaction network into some unattached risk chains was explained; thirdly, a formula was provided to assess the various risk chains, according to obtained parameters from a simulation process taking the information of project schedule and properties of risk chains into consideration. Finally, a numerical example was analyzed to illustrate the feasibility and effectiveness of the proposed approach.

    Reference
    [1]Zou P X W, Zhang G, Wang J. Understanding the key risks in construction projects in China[J]. International Journal of Project Management, 2007, 25(6): 601-614.
    [2]Lam K C, Wang D, Lee P T K, et al. Modelling risk allocation decision in construction contracts[J]. International Journal of Project Management, 2007, 25(5): 485-493.
    [3]Schatteman D, Herroelen W, Van de Vonder S, et al. Methodology for integrated risk management and proactive scheduling of construction projects[J]. Journal of Construction Engineering and Management, 2008, 134(11): 885-893.
    [4]?kmen ?, ?zta? A. Construction project network evaluation with correlated schedule risk analysis model[J]. Journal of Construction Engineering and Management, 2008, 134(1): 49-63.
    [5]Baccarini D, Archer R. The risk ranking of projects: a methodology[J]. International Journal of Project Management, 2001, 19(3): 139-145.
    [6]Lyons T, Skitmore M. Project risk management in the Queensland engineering construction industry: a survey[J]. International journal of project management, 2004, 22(1): 51-61.
    [7]Kwak Y H, LaPlace K S. Examining risk tolerance in project-driven organization[J]. Technovation, 2005, 25(6): 691-695..
    [8]PMBoK A. Guide to the project Management body of knowledge[J]. Project Management Institute, Pennsylvania USA, 2000.
    [9]Zayed T, Amer M, Pan J. Assessing risk and uncertainty inherent in Chinese highway projects using AHP[J]. International Journal of Project Management, 2008, 26(4): 408-419.
    [10]Wang Y M, Liu J, Elhag T. An integrated AHP–DEA methodology for bridge risk assessment[J]. Computers Industrial Engineering, 2008, 54(3): 513-525.
    [11]Bahli B, Rivard S. Validating measures of information technology outsourcing risk factors[J]. Omega, 2005, 33(2): 175-187.
    [12]Luu V T, Kim S Y, Tuan N V, et al. Quantifying schedule risk in construction projects using Bayesian belief networks[J]. International Journal of Project Management, 2009, 27(1): 39-50.
    [13]Carr V, Tah J H M. A fuzzy approach to construction project risk assessment and analysis: construction project risk management system[J]. Advances in Engineering software, 2001, 32(10): 847-857
    [14]Khashman A. Neural networks for credit risk evaluation: Investigation of different neural models and learning schemes[J]. Expert Systems with Applications, 2010, 37(9): 6233-6239.
    [15]Angelini E, di Tollo G, Roli A. A neural network approach for credit risk evaluation[J]. The Quarterly Review of Economics and Finance, 2008, 48(4): 733-755.
    [16]阮欣, 尹志逸, 陈艾荣. 风险矩阵评估方法研究与工程应用综述[J]. 同济大学学报(自然科学版), 2013 (3): 381- 385.Ruan Xin, Yin Zhiyi,Chen Airong. A review on risk matrix method and its engineering applicaton[J]. journal of Tongji university (natural science) , 2013 (3): 381-385.
    [17]Ascensio′nZafra-Cabeza, Miguel A. Ridao, Eduardo F. Camacho. Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing. European Journal of Operational Research , 2008,190 :708–723.
    [18]李藐, 陈建国, 陈涛, 等. 突发事件的事件链概率模型[J]. 清华大学学报(自然科学版), 2010 (8): 1173-1177.Li Miao, Chen Jianguo, Chen Tao, et al. Probability for disaster chains in emergencies[J]. Journal of Tsinghua University ( Sci Tech), 2010(8):1173-1177.
    [19]Cozzani V, Gubinelli G, Antonioni G, et al. The assessment of risk caused by domino effect in quantitative area risk analysis[J]. Journal of Hazardous Materials, 2005, 127(1): 14-30.
    [20]张维忠. 控制心血管危险因素的现代概念[J]. 中华内科杂志, 2004, 43(10): 721-722.Zhang Weizhong. Modern concept of controlling dangerous factors of angiocarpy[J]. Chinese Journal of Internal Medicine, 2004, 43(10): 721-722.
    [21]Antonioni G, Spadoni G, Cozzani V. A methodology for the quantitative risk assessment of major accidents triggered by seismic events[J]. Journal of hazardous materials, 2007, 147(1): 48-59.
    [22]Baranoff E G, Sager T W. The relations among asset risk, product risk, and capital in the life insurance industry[J]. Journal of banking finance, 2002, 26(6): 1181-1197.
    [23]Liao Xiu-Wu, Wan Tao; Li Yuan.A Bayesian network model under group decision making for evaluating IT outsourcing risk[c]. Proceedings of International Conference on Risk Management and Engineering Management, p 559-564, 2008 International Conference on Risk Management and Engineering Management( ICRMEM 2008)
    [24]Büyük?zkan G, Ruan D. Choquet integral based aggregation approach to software development risk assessment[J]. Information Sciences, 2010, 180(3): 441-451.
    [25]张磊, 樊治平, 乐琦. 考虑风险关联情形的风险评估方法研究[J].运筹与管理,2011 (6): 188-195.Zhang Lei, Fan Zhiping. A Method for Estimating Risks Considering the Interrelationships Among Risks[J], Operations Research and Management Science, 2011 (6): 188-195.
    [26]李存斌, 陆龚曙. 工程项目风险元传递的系统动力学模型[J]. 系统工程理论与实践, 2013, 32(12): 2731-2739.Li Cunbin, Lu Gongshu. System dynamics model of construction Project risk element transmission[J].Systems Engineering -Theory Practice, 2013, 32(12): 2731-2739.
    [27]Mulholland B, Christian J. Risk assessment in construction schedules[J]. Journal of Construction Engineering and Management, 1999, 125(1): 8-15.
    [28]Schatteman D, Herroelen W, Van de Vonder S, et al. Methodology for integrated risk management and proactive scheduling of construction projects[J]. Journal of Construction Engineering and Management, 2008, 134(11): 885-893.
    [29]Nasir D, McCabe B, Hartono L. Evaluating risk in construction-schedule model (ERIC-S): construction schedule risk model[J]. Journal of Construction Engineering and Management, 2003, 129(5): 518-527.
    [30]Raj T, Shankar R, Suhaib M. An ISM approach for modelling the enablers of flexible manufacturing system: the case for India[J]. International Journal of Production Research, 2008, 46(24): 6883-6912.
    [31]曹吉鸣.工程施工组织与管理[M].上海:同济大学出版社,2011.CAO Jiming. Project construction organization and management [M].Shanghai: Tongji Universty Press,2011.
    Cited by
Get Citation

CAO Jiming, SHEN Liangfa, PENG Wei, MA Teng. Novel Method for Schedule Risks Assessment in Construction Projects from Perspective of Risk Chain[J].同济大学学报(自然科学版),2015,43(3):0468~0474

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 27,2014
  • Revised:December 09,2014
  • Adopted:September 28,2014
  • Online: March 18,2015
Article QR Code