Critical Chain, Project Schedule Management Based on Bayesian Network Model
CSTR:
Author:
Affiliation:

Clc Number:

F294;C935

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A critical chain project management bias network model (CCPMBN) based on work breakdown structure (WBS) and Bayesian Network was established, which took full consideration into the temporal relations and resource constraints. The corresponding resources were proposed and the deadline of the construction was determined by Monte Carlo Model. The result shows that, with the method, the critical factors influencing the deadline can be well recognized. The proposed model provides an important reference for realizing of the construction schedule.

    Reference
    Related
    Cited by
Get Citation

YOU Jianxin, QIN Yun. Critical Chain, Project Schedule Management Based on Bayesian Network Model[J].同济大学学报(自然科学版),2015,43(10):1606~1612

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 05,2015
  • Revised:July 25,2015
  • Adopted:June 11,2015
  • Online: October 26,2015
  • Published:
Article QR Code