Assembly Line Balancing Problem2 with Task Zoning Constraints and Workstation Related Constraints
CSTR:
Author:
Affiliation:

Clc Number:

TB491

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The balance of assembly line has a great effect on the output of products, and is also a problem to be dealt with at the phases of designing and reconfiguring. Aimed at the current assembly line balancing problem type2(ALBP2), a multiobjective model was proposed, taking task sequence constraints, task zoning constraints and workstation related constraints into account, to minimize cycle time and workloading smoothness index. First, a dynamic step length method was applied, which gradually shrank the searching span of cycle time, to improve the efficiency of computing. Then, an improved PSO algorithm based on a Back Algorithm (BA) was introduced to promote the rationality of tasksallocating. After that task allocation matrix was described to show details of task allocations in stations and clarify the result. Finally, a case was illustrated to prove the effectiveness of the proposed method.

    Reference
    Related
    Cited by
Get Citation

XU Liyun, CAI Bingjie, QU Baosheng, LI Aiping. Assembly Line Balancing Problem2 with Task Zoning Constraints and Workstation Related Constraints[J].同济大学学报(自然科学版),2016,44(2):269~275

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 17,2015
  • Revised:November 30,2015
  • Adopted:April 20,2015
  • Online: March 04,2016
  • Published:
Article QR Code