Synthetic Evaluation on Risk of Deep Excavation Engineering Construction Process
CSTR:
Author:
Affiliation:

Clc Number:

TU473

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For the three main problems remaining to be solved in the construction process of deep excavation engineering: building a risk index system, distributing the weight of evaluation indexes and evaluating the risk, this article builds a risk evaluation system based on the DS(DempsterShafer) evidence theory combined with interval number theory. Firstly we identify the risk factors by “WBSRBS” and “01” methods to build the risk index system based on the construction principle and management process of deep excavation. In order to decrease the subjectivity of the process of deep excavation risk quantification, then we combine the advantages of interval number theory and DS evidence theory to specify the methods and procedures about how to build identifying framework, choose the reliability function and synthesize information. At last, the rationality and feasibility of the risk evaluation system are manifested by analyzing the example.

    Reference
    Related
    Cited by
Get Citation

CHENG Hongqun, SHE Jiaxue, YUAN Ning, PENG Zhaohui. Synthetic Evaluation on Risk of Deep Excavation Engineering Construction Process[J].同济大学学报(自然科学版),2016,44(3):0491~

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 20,2015
  • Revised:December 08,2015
  • Adopted:September 07,2015
  • Online: March 24,2016
  • Published:
Article QR Code