Driving Unit Control Method for Shield Metro Tunnel Construction
Author:
Affiliation:

Clc Number:

U455.43

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Driving unit chain concept was put forward to explore the shield refinement tunneling technology in complex and changeable strata and environment instead of the traditional control method according to the interval length. Then four key elements of driving unit were defined including the connotation, the principle of division, the steps and the application conditions. Subsequently, a new method of driving unit control in construction of shield metro tunnel was established, which was applied to the Hangzhou Metro Line 1 project across the Qiantang River. By the targeted control of 55 driving units, the earth pressure balance shield was adopted successfully for the project crossing the Qiantang River for the first time.

    Reference
    Related
    Cited by
Get Citation

ZHOU Shunhua, JI Chang. Driving Unit Control Method for Shield Metro Tunnel Construction[J].同济大学学报(自然科学版),2017,45(03):0342~0346

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 22,2016
  • Revised:December 31,2016
  • Adopted:December 20,2016
  • Online: April 01,2017
  • Published: