Estimating Construction Duration for Airport Terminal Megaprojects
CSTR:
Author:
Affiliation:

Clc Number:

F281

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A controllingactivity based model was proposed to estimate the construction duration of terminal megaprojects from the consulting achievements of project timecontrolling for more than ten airport megaprojects in China (2000—2016). First, typical construction sequences of controlling activities for each possible critical path were determined, and the distributions of nonoverlapping time between controlling activities were fitted. After that, based on fitting the duration distributions of four possible critical paths, a model for predicting the duration of terminal building was proposed and applied to three completed terminals. The results show that the proposed model reasonably predicts the construction duration for the case projects. Compared to traditional risk planning methods, the model proposed simplifies the complex work.

    Reference
    Related
    Cited by
Get Citation

JIA Guangshe, MOU Qiang, TANG Kewei. Estimating Construction Duration for Airport Terminal Megaprojects[J].同济大学学报(自然科学版),2017,45(07):1091~

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 26,2016
  • Revised:May 10,2017
  • Adopted:February 15,2017
  • Online: July 20,2017
  • Published:
Article QR Code