Time-risk Controlling in Early Stage of Mega Construction Project
CSTR:
Author:
Affiliation:

Clc Number:

F281

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on project-time controlling and risk management theory, a time-risk controlling model has been proposed to solve the problem of high uncertainty in the early stage of mega construction project (MCP) from the consulting achievements for several airport megaprojects. Next, the model was applied to develop pre-stage schedules and risk lists for XY airport megaproject. Finally, the effectiveness of controlling method was proved by comparing the overall time-risks of XY airport and other two airport pre-schedules, and comparing the effect before and after implementation of the customized plan. The risk-based method improves the applicability of project time-controlling at the front-end, and provides a methodological guidance for early time control of MCPs.

    Reference
    Related
    Cited by
Get Citation

JIA Guangshe, MOU Qiang. Time-risk Controlling in Early Stage of Mega Construction Project[J].同济大学学报(自然科学版),2018,46(01):0125~0132

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 19,2017
  • Revised:November 06,2017
  • Adopted:October 12,2017
  • Online: February 01,2018
  • Published:
Article QR Code