Design and Analysis of Reinforced Concrete Coupled Shear Wall with Replaceable Coupling Beams
CSTR:
Author:
Clc Number:

TU398.2

  • Article
  • | |
  • Metrics
  • |
  • Reference [37]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    In this study, a new kind of coupling beam is proposed, which is composed of nonreplaceable part and replaceable part. During earthquakes, the replaceable parts yield first and the nonreplaceable parts remain elastic. The design method of the new replaceable coupling beam is introduced. The numerical simulation and comparison analysis are carried out. The results show that under minor earthquakes, the replaceable parts remain elastic. Under moderate earthquakes and major earthquakes, the replaceable parts yield first and the damage of the new coupling beams concentrates on the replaceable part. Compared with the traditional reinforced concrete coupled shear wall, the seismic performance of the new coupled shear wall is improved significantly. Finally, the relationship between the deformation of the replaceable part and inter-story drift ratio is proposed, providing the basis for the design of the replaceable part.

    Reference
    [1] Chaallal O, Gauthier D, Malenfant P. Classification methodology for coupled shear walls [J]. Journal of Structural Engineering, 1996, 122(12): 1453-1458.
    [2] Takayanagi T, Schnobrich W C. Non‐linear analysis of coupled wall systems [J]. Earthquake Engineering & Structural Dynamics, 1979, 7(1): 1-22.
    [3] 王社良,陈平,沈亚鹏. 钢筋混凝土双肢剪力墙的抗震性能[J]. 西安建筑科技大学学报,1996, 28(4): 397-401.
    WANG duliang, CHEH ping, SHEN yapeng. On aseismic behavior of RC coupled shear walls[J]. Journal of Xi’an University of Architecture and Technology, 1996, 28(4): 397-401.
    [4] 王亚勇. 汶川地震建筑震害启示——抗震概念设计[J]. 建筑结构学报,2008, 04: 20-25.
    WANG yayonog. Lessons learnt from building damages in the Wenchuan earthquake-seismic concept design of buildings[J]. Journal of Building Structures, 2008, 04: 20-25.
    [5] Wallace, J. W. (2012) “Behavior, design, and modeling of structural walls and coupling beams–lessons from recent laboratory tests and earthquakes.” International Journal of Concrete Structures and Materials, 6(1), 3-18.
    [6] Kam, W. Y., and Pampanin, S. (2011). “The seismic performance of RC buildings in the 22 February 2011 Christchurch earthquake.” Structural Concrete, 12(4), 223-233.
    [7] NIED and NEES Consortium. Report of the Seventh Joint Planning Meeting of NEES/E: Defense Collaborative Research on Earthquake Engineering[R]. PEER 2010/109. Berkeley, CA: University of California at Berkeley, 2010.
    [8] Fortney P J, Shahrooz B M, Rassati G A. Seismic performance evaluation of coupled core walls with concrete and steel coupling beams [J]. Steel and Composite Structures Journal. 2007, 7(4): 279-301
    [9] Fortney P J, Shahrooz B M, Rassati G A. Large-scale testing of a replaceable fuse steel coupling beam [J]. Journal of Structural Engineering, 2007, 133(12): 1801-1807.
    [10] Kim H J, Choi K S, Oh S H, et al. Comparative study on seismic performance of conventional RC coupling beams and hybrid energy dissipative coupling beams used for RC shear walls [C]. Proceedings of 15WCEE, September 24-28, 2012, Lisbon, Portugal, Paper ID: 2254.
    [11] Lyons R M, Christopoulos C, Montgomery M S. Enhancing the seismic performance of RC coupled wall high-rise buildings with viscoelastic coupling dampers [C]. Proceedings of 15WCEE, September 24-28, 2012, Lisbon, Portugal, Paper ID: 1573.
    [12] Montgomery M, Christopoulos C. Experimental validation of viscoelastic coupling dampers for enhanced dynamic performance of high-rise buildings [J]. Journal of Structural Engineering, 2014.
    [13] 滕军,马伯涛,李卫华,等. 联肢剪力墙连梁阻尼器地震模拟试验研究[J]. 建筑结构学报,2010, 31(12): 101-107.
    TENG jun, MA botao, LI weihua, et al. Seismic simulation test for coupling beam damper of coupled shear wall structure[J]. Journal of Building Structures, 2010, 31(12): 101-107.
    [14] Wang T, Guo X, He X K, et al. Experimental study on replaceable hybrid coupling beams [J]. Applied Mechanics and Materials, 2012, 166: 1779-1784.
    [15] 吕西林,陈云,蒋欢军. 可更换连梁保险丝抗震性能试验研究[J]. 同济大学学报:自然科学版, 2013,41(9): 1318-1325.
    LU Xilin, CHEN yun, JIANG huanjun. Experimental study on seismic behavior of ‘fuse’ of replaceable coupling beam[J]. Journal of Tongji University: Natural Science, 2013, 41(9): 1318-1325.
    [16] 武豪,郭子雄,刘阳. 基于有限元方法的震损可替换钢连梁抗震性能研究[J]. 地震工程与工程振动,2014, 34(2): 41-49.
    WU hao, GUO zixiong, LIU yang. Study on the seismic behavior of replaceable steel coupling beams with finite element method[J]. Earthquake Engineering and Engineering Dynamics, 2014, 34(2): 41-49.
    [17] Dusicka P, Itani A, and Buckle I. Cyclic Behavior of Shear Links of Various Grades of Plate Steel[J]. Journal of Structural Engineering, 2010136(4), 370–378.
    [18] JGJ3-2010 高层建筑混凝土结构技术规程[S]. 北京:中国建筑工业出版社,2010.
    JGJ3-2010 Technical specification for concrete structures of tall building[S]. Beijing: China Architecture and Building Press, 2010.
    [19] ANSI A. AISC 341-10 (2010). Seismic provisions for structural steel buildings[S]. Chicago: American Institute of Steel Construction, 2010.
    [20] Engelhardt M D, Popov E P. On design of eccentrically braced frames[J]. Earthquake spectra, 1989, 5(3): 495-511.
    [21] GB50010-2010 混凝土结构设计规范[S]. 北京:中国建筑工业出版社,2010.
    GB50011-2010 Code for design of concrete structures[S]. Beijing: China Architecture and Building Press, 2010.
    [22] GB50011-2010 建筑抗震设计规范[S]. 北京:中国建筑工业出版社,2010.
    GB50011-2010 Code for seismic design of buildings[S]. Beijing: China Architecture and Building Press, 2010.
    [23] 邓明科,梁兴文,辛力. 剪力墙结构基于性能抗震设计的目标层间位移确定方法[J]. 工程力学,2008, 25(11): 141-148.
    DENG mingke, LIANG xingwen, XIN li. Determination of target story drift for RC shear wall structure in performance-based seismic design[J]. Engineering Mechanics, 2008, 25(11): 141-148.
    [24] 李坤,史庆轩,郭智峰,等. 钢筋混凝土剪力墙结构受力层间位移计算及探讨[J]. 土木工程学报,2013(s2): 86-92.
    LI kun, SHI anxuan, GUO zhifeng, et al. Calculation and discussion of physical inter-story displacement for reinforced concrete shear wall structures[J]. China Civil Engineering Journal, 2013(s2): 86-92.
    [25] Mander J B, Priestley M J N, Park R. Theoretical stress-strain model for confined concrete[J]. Journal of structural engineering, 1988, 114(8): 1804-1826.
    [26] Birtel V, Mark P. Parameterized Finite Element Modeling of RC Beam Shear Failure [C]. 2006 ABAQUS User's Conference. Taiwan, 2006: 95-108.
    [27] Chaboche J L. Time-independent constitutive theories for cyclic plasticity[J]. International Journal of Plasticity, 1986, 2(2): 149-188.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

LI Shurong, JIANG Huanjun. Design and Analysis of Reinforced Concrete Coupled Shear Wall with Replaceable Coupling Beams[J].同济大学学报(自然科学版),2018,46(07):0868~0876

Copy
Share
Article Metrics
  • Abstract:1429
  • PDF: 974
  • HTML: 620
  • Cited by: 0
History
  • Received:September 13,2017
  • Revised:May 09,2018
  • Adopted:March 04,2018
  • Online: August 08,2018
Article QR Code