Modeling and Optimization of Resource Investment Problem with Resource Window
CSTR:
Author:
Affiliation:

Clc Number:

F273

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Resource investment problem with resource window constraint was considered in the context of aircraft mobile assembly line. A mathematical model was proposed to solve the problem with the objective of the total cost minimization of resource. Firstly, based on the characteristics of the resource window constraint, a constructive heuristic algorithm with non-critical activity priority decision rules was developed to solve small-scale problems. Secondly, a genetic algorithm, which was coded by a double-linked list including non-critical activity priority and critical activity start time and decoded by non-critical activity priority decision rules, was proposed for the large-scale problems. Finally, numerical experiments were carried out to compare the advantages and disadvantages between heuristic algorithm, genetic algorithm and CPLEX, and the effectiveness of the two proposed algorithms was proved.

    Reference
    Related
    Cited by
Get Citation

LU Zhiqiang, ZHOU Haoxue. Modeling and Optimization of Resource Investment Problem with Resource Window[J].同济大学学报(自然科学版),2019,47(10):1520~1527

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 12,2018
  • Revised:July 27,2019
  • Adopted:March 28,2019
  • Online: October 17,2019
  • Published:
Article QR Code