Construction Risk Control Mechanism for Fabricated Concrete Structure
CSTR:
Author:
Clc Number:

TU714

  • Article
  • | |
  • Metrics
  • |
  • Reference [15]
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    The safety risks of prefabricated concrete structure in the construction phase are identified through field research and conference discussion, and are quantitatively evaluated by using Bayesian network. The results show that the probability of prefabricated components instability during hoisting is the highest, followed by prefabricated components toppling, and the violent sloshing of prefabricated components during hoisting. To deal with these safety problems, concrete risk control measures are proposed from a microcosmic perspective of site management, design and construction coordination in project and a macrocosmic perspective of development environment in industry. A multi-angle and multi-stage construction risk prevention and control mechanism is constructed, which will provide reference for construction safety management of prefabricated concrete structure.

    Reference
    [1] 蒋勤俭.国内外装配式混凝土建筑发展综述[J].建筑技术,2010,41(12):1074-1077.Jiang Qinwei. Overview of the development of fabricated concrete buildings at home and abroad[J].建筑技术,2010,41(12):1074-1077.
    [2] Luo Lizi, Mao Chao, Shen Liyin, Li Zhengdao. Risk factors affecting practitioners'' attitudes toward the implementation of an industrialized building system A case study from China[J]. Engineering Construction and Architecture Management, 2015(22): 622-643.
    [3] Chen Ying, Okudan Guel E, Riley David R. Sustainable performance criteria for construction method selection in concrete buildings[J]. Automation in Construction, 2010(19): 235-244.
    [4] 住建部:“十三五”装配式建筑行动方案[J].居业,2017(09):15-17.Ministry of Housing and Urban-Rural Development: "13th Five-Year" Prefabricated Building Action Plan [J]. Home, 2017 (09): 15-17.
    [5] Jaillon, Lara, Poon, Chi-Sun. Design issues of using prefabrication in Hong Kong building construction[J]. Construction Management and Economics, 2010(10)S: 1025-1042.
    [6] 林宗凡,E.I.Sagan,M.E.Kreger.装配式抗震框架延性节点的研究[J].同济大学学报(自然科学版),1998(02):134-138.Lin Zongfan, E. I. Sagan, M. E. Kreger. Research on ductile joints of fabricated seismic frame[J]. Journal of Tongji University(Natural Science),1998(02):134-138.
    [7] 杨霞,仲小亮.预制装配式建筑外墙防水密封现状及存在的问题[J].中国建筑防水,2016(12):16-18.Yang Xia, Zhong Xiaoliang. Present Situation and Existing Problems of Prefabricated Building Exterior Wall Waterproof Seal[J]. China Building Waterproofing,2016(12):16-18.
    [8] VIDJEAPRIYA R, JAYA KP, MONTPELLIER P, et al. Experimental Study on Two Simple Mechanical Precast Beam-Column Connections under Reverse Cyclic Loading [J]. Journal of Performance of Constructed Facilities, 2013, 27(4):402-414.
    [9] 郭小农,高舒羽,裴进玉,罗晓群.预制混凝土梁端预埋槽钢节点静力性能试验[J].同济大学学报(自然科学版),2017,45(09):1258-1264.Guo Xiaonong, Gao Shuyu, Zhai Jinyu, Luo Xiaoqun. Test on Static Performance of Precast Concrete Beam Ends with Precast Concrete Beams[J]. Journal of Tongji University (Natural Science),2017,45(09):1258-1264.
    [10] 陈伟,秦海玲,童明德.多维作业空间下的装配式建筑工程资源调度[J].土木工程学报,2017,50(03):115-122.Chen Wei, Qin Hailing, Tong Mingde. Resource scheduling of fabricated building engineering under multi-dimensional work space[J]. China Civil Engineering Journal,2017,50(03):115-122.
    [11] 陈伟,付杰,熊付刚,杨劼.装配式建筑工程施工安全灰色聚类测评模型[J].中国安全科学学报,2016,26(11):70-75.Chen Wei, Fu Jie, Xiong Fugang, Yang Wei. A Safety Grey Clustering Evaluation Model for Prefabricated Building Engineering[J]. Chinese Journal of Safety Science,2016,26(11):70-75.
    [12] Pear J. Probabilistic reasoning in intelligent systems: networks of plausible inference[M]. San Mateo, California: Morgan Kaufmann Publishers, 1988.
    [13] Matias J. M, Rivas T, Martin J. E, Taboada J. A machine learning methodology for the analysis of workplace accidents[J]. International Journal of Computer Mathematics, 2008,85(3-4):559-578.
    [14] Friedman N, Linial M, Nachman I, Pe''er D. Using Bayesian networks to analyze expression data[J]. Journal of Computational Biology, 2000(7):601-620.
    [15] Sproles, Claudene. Intergovernmental Panel on Climate Change (IPCC)[J]. Government Information Quarterly, 2009,26(2):428-429.
    Related
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

GAO Xin, CHEN Linyan, PI Zongjie, LI Zhou. Construction Risk Control Mechanism for Fabricated Concrete Structure[J].同济大学学报(自然科学版),2019,47(11):1676~1682

Copy
Share
Article Metrics
  • Abstract:798
  • PDF: 1119
  • HTML: 1428
  • Cited by: 0
History
  • Received:December 27,2018
  • Revised:August 16,2019
  • Adopted:July 01,2019
  • Online: December 05,2019
Article QR Code