Modeling of Resource Constrained Project Takt Transition Scheduling Problem for Aircraft Pulsating Assembly Line
CSTR:
Author:
Affiliation:

School of Mechanical Engineering, Tongji University, Shanghai 201804, China

Clc Number:

TP29

  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    A resource constrained project takt transition scheduling problem based on project splitting was proposed under the background of aircraft pulsating assembly line takt transition process, and a mathematical model was established with the objective function of minimizing total transition time. According to the feature of the problem, a two-level iterative algorithm was developed. It is shown that the algorithm can decrease the transition time effectively and the degree of optimization for different project portfolios is 1.1%~23.4%.

    Reference
    Related
    Cited by
Get Citation

LU Zhiqiang, WANG Haoyu. Modeling of Resource Constrained Project Takt Transition Scheduling Problem for Aircraft Pulsating Assembly Line[J].同济大学学报(自然科学版),2021,49(12):1761~1770

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 09,2021
  • Online: December 30,2021
Article QR Code