Adaptability Analysis of Compressed Air and Stratum in Non-full Chamber Excavation of Earth Pressure Shield
Author:
Affiliation:

1.College of Civil and Transportation Engineering, Hohai University, Nanjing 210098, China;2.China Energy Engineering Group Jiangsu Power Design Institute Co., Ltd., Nanjing 211102,China;3.Guangzhou Metro Group Co.,Ltd., Guangzhou 510220, China;4.Guangzhou Rail Transit Construction Engineering Consulting Co.,Ltd., Guangzhou 510010, China

Clc Number:

U25

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at increasing engineering practice of compressed-air-assisted method, based on the numerical calculation model of air-water-solid coupling established by Geostudio Air/w, the influence of different shield tunnel top buried depth, thickness of overlying airtightness layer, stratum property and pressure chamber height on the seepage volume of excavation face was discussed. The results show that: The application case of compressed-air-assisted method in a section of Guangzhou Metro Line 21 is analyzed. The seepage gas volume is controlled within 1.2 m3·min-1. A stable support pressure is established on the excavation surface to ensure that the shield tunneling reaches the micro-disturbance control level. When the earth pressure shield tunneling in silty clay and clay stratum with high airtightness ability, appropriate compressed air can be injected into the pressure chamber to better maintain the stability of the support pressure of the excavation face; To ensure the seepage volume is less than the gas production. When it is difficult to carry out full-cabin excavation in sandy cobble , upper soft and lower hard stratum with large permeability coefficient and unequal geological distribution, the appropriate empty chamber height can be selected according to the buried depth and the thickness of the overlying airtightness layer. When the earth pressure shield crossing permeable stratum and the thickness of the overlying airtightness layer exceeding 10.0m, or the buried depth exceeding 28.0m, compressed air escape amount is less, and it is not easy to occer roof fall under compressed air.

    Reference
    Related
    Cited by
Get Citation

ZHONG Xiaochun, YU Mingxue, ZHU Weibin, MI Jinsheng, ZHONG Changping, HUANG Weiran, ZHU Siran. Adaptability Analysis of Compressed Air and Stratum in Non-full Chamber Excavation of Earth Pressure Shield[J].同济大学学报(自然科学版),2024,52(8):1219~1226

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 05,2022
  • Revised:
  • Adopted:
  • Online: August 30,2024
  • Published: