Settlement Monitoring and Analysis of High Filling Project for Resettlement Area of Baihetan Hydropower Station
CSTR:
Author:
Affiliation:

1.College of Civil Engineering, Tongji University, Shanghai 200092, China;2.Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education, Tongji University, Shanghai 200092, China;3.Power China Huadong Engineering Corporation Limited, Hangzhou 311122, China

Clc Number:

TU44

  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    In order to ensure the stability and the serviceability of high filling foundations, the field monitoring of the high filling project of Baihetan Hydropower Station is introduced, and the settlements of the original foundation and the filling are analyzed in this paper. The influencing factors such as the height of filling, compaction degree, time, and variation of groundwater on the settlement are discussed. The results indicate that the settlement of the high filling project with gravel filler is caused by the original foundation and the compression of the filling. The settlements of the original foundation and the filling account for 39.7% and 60.3% of the total settlement, respectively. The proper increase of foundation compaction degree is an effective measure to control the foundation settlement. Different fitting models are used to predict the settlement of high fill foundations, and it is found that the exponential model can successfully predict the settlement of the high filling project. The impoundment in the reservoir causes the groundwater level in the filling area to rise, and the instantaneous wetting deformation of the soil accounts for 60.9% of the total wetting deformation. The increase and dissipation of pore water pressure are mainly affected by groundwater level and filling load. A linear relationship between the magnitude of excess pore water pressure and the filling load is observed and the coefficient is 0.021, indicating that the soil is stable. The excess pore water pressure gradually dissipated after completion.

    Reference
    Related
    Cited by
Get Citation

GU Xiaoqiang, LIANG Yuzhen, ZHOU Qihui, LIU Zunjing, FAN Zhiqiang, JING Zijing. Settlement Monitoring and Analysis of High Filling Project for Resettlement Area of Baihetan Hydropower Station[J].同济大学学报(自然科学版),2024,52(10):1517~1526

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 06,2022
  • Online: November 01,2024
Article QR Code